Pipework, heating and services
The part of the job you never see again: boilers, manifolds, expansion vessels and water pipes tucked away neatly and kept accessible.
Half of a bathroom is installation work. Water pipes, drainage, electrics and heating end up behind tiles and screed. After that you cannot easily get at them.
These photos come from several jobs: boilers with a manifold and expansion vessel, new water pipes and drains, and the stud walls it all disappears into.
CV-ketel, verdeler en expansievat
De ketel hangt met de verdeler en het expansievat in één blok, zodat het onderhoud bereikbaar blijft en de leidingen strak naast elkaar lopen.
Waterleiding en voorzetwanden
Nieuwe leidingen worden op maat getrokken en verdwijnen in voorzetwanden of in de vloer, met de aansluitpunten precies op tegelmaat.
Videos of the job
A walk through the room, filmed during or just after handover.
All photos of this project
6 shots from the job file: strip-out, pipework, tiling and detail photos.